Huade Comprehensive Building Project

Project Name: Huade Comprehensive Building Project (2011-2012, RMB 80 million)
Region: Hubei Progress Stage: Environmental Impact Assessment Construction Period: 2011-2012 Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical facilities, ventilation facilities, lighting facilities.
Project Description:
The project is located at No. 89, Checheng West Road, Shiyan City. The project has a total planned investment of 80 million yuan, a total land area of ​​8,502 square meters, and a total construction area of ​​52,000 square meters. The underground floors 1 and 2 are parking lots and the ground floor is 1 to 3 floors. Layers, 4-30 floors are residential, divided into two units, a total of about 300 households. The floor area ratio of the building is 4.98, the building density is 39.43%, and the greening rate is 10.8%.

Construction unit: Shiyan Huade Real Estate Development Co., Ltd. Postal address: 89 Checheng West Road, Shiyan City Zip code: 442000
Contact: Que Phone

Design Unit: Shiyan City Environmental Science Research Institute (EIA)
Postal address: No. 6 Chaoyang Middle Road, Shiyan City, Hubei Province Post Code: 442000
Contact: Zhou Jun Tel: 0719-8114343

Related Developments: Tower Crane Infrastructure Project

H Beam Cutting Robot

Beam Cutting Machine,H Beam Cutting Machine,Cnc H Beam Cutting Machine,H Profile Cnc Cutting Machine

Metal Pipe Cutting Machine,Metal Pipes & Profiles Production Line,Co., Ltd. , http://www.nbmjjx.com

This entry was posted in on