China's blast furnace exports to Brazil successfull…

Brazil's GerdauAcominas No. 2 blast furnace EP project three hot stoves have successfully implemented the oven. This is not only the first large-scale metallurgical equipment export project undertaken by CISDI Engineering Technology Co., Ltd., but also the final stage of the la ---MORE---

This entry was posted in 202104 on

China's first auto chassis automatic detection equi…

Xinhua News Agency, Zhengzhou, October 22 (Reporter Li Lijing) was informed by the Luoyang Municipal Government of Henan Province that on October 21st, the first automatic detection equipment for automobile chassis parts in China was successfully operated by Libang Measurement and ---MORE---

This entry was posted in 202104 on

Finite Element Analysis of Pressure Vessel Tube Plate B…

Preface The pressure vessel tube plate is an important part of the pressure vessel. According to the characteristics of the tube plate structure, it directly affects the pressure bearing capacity of the tube box. Its deformation and stress analysis play a decisive role in the stress ---MORE---

This entry was posted in 202104 on

All-round short-cone module tool system analysis

1 Proposal With the gradual upgrading of the tool system and the requirements for the mechanical environment, the current internationally popular all-powerful short-cone modular tool system. The system occupies the commanding height of the modular tool system with high po ---MORE---

This entry was posted in 202104 on

Daily Maintenance and Maintenance of Diesel Car Fuel In…

Ms. Zhang, Gogol Street, Nangang District Q: How should the fuel pump of a diesel car be maintained to prolong the service life? Liu workers A: The daily use of fuel pump maintenance should pay attention to the following aspects: 1. To choose a higher alkane, better evaporation, freezing point an ---MORE---

This entry was posted in 202104 on

History: China cracked the world about heat pump air co…

In the autumn of 1902, the inventor of air conditioning opened the train at Pittsburgh station. The temperature was only 30 degrees Fahrenheit, the station was covered with thick fog. At this point, the light in his brain came to light: as the formation of fog, if you can make the air saturated, an ---MORE---

This entry was posted in 202104 on

Weichai accelerates its development towards high power

On October 10, a WD12 engine with the words "10,000th WD12 engine" was slowly removed from the assembly line of the No. 1 plant in the Weichai New Power Plant and immediately loaded onto the vehicle plant. This is a memorable day. The WD12 engine was officially offline at the 60th annive ---MORE---

This entry was posted in 202104 on